This project included the complete refurbishment of 5 classrooms, with new linings, floor coverings, joinery, electrical and data throughout. A new PWD access ramp was installed to the 2nd level of teaching block A, including insulated panel roof, galvanised balustrades and handrails, and perforated aluminum screens. A new PWD amenities was installed, complete with motorised change table.